HUMBOLDT LANDFILL converts to TRANSFER STATION

Post Reply
reactsask
Posts: 9
Joined: Wed Sep 26, 2012 6:36 pm

HUMBOLDT LANDFILL converts to TRANSFER STATION

Post by reactsask »

The Humboldt Landfill Will Be Converting To A Transfer Station!!!
Effective November 12, 2019...

The Humboldt landfill be will be converting into a household waste transfer station. There will no longer be a garbage pit in which to dump construction and demolition waste. Non-commercial waste is restricted to an 8ft 1/2 ton truck box OR equivalent trailer load size. All waste must be disposed of by hand into bins for REACT to transport to the new landfill. Loads larger than an 8ft 1/2 ton truck box will have to be hauled to the new landfill.
*All commercial loads will be directed to the new landfill located in the R.M. of LeRoy*

The Humboldt site will continue to accept the following:
Used oil and filters
Grain bags
Concrete
Compost
Clean wood and tree branches
Metals
Waste into bins only
*All loads MUST be tarped or secured down or a surcharge will be applied to your load at both sites.


The New Landfill - REGIONAL SOLID WASTE & DIVERSION CENTRE - in the RM of LeRoy
*All loads MUST be tarped or secured down or a surcharge will be applied to your load at both sites.
Phone #: 306-682-0010
Email: scale.react@sasktel.net


NEW Scale House - all loads will be required to go over the weigh scale

Hours of Operation:
Monday – Friday: 9:00am – 5:00pm
Hours may be subject to change in the New Year

Land Location: SW 31-35-21 W2

Directions for Designated Haul Route: From the corner of Main Street and 8th Avenue at the 7-Eleven lights, turn south on Main Street and go 19km, turn east onto Grid 354 and go 10 km, then turn north and go 2km – landfill is on east side of the road.

Post Reply